Manufacturing: China & Russia · Worldwide supply
EN RU

Section 03 · Auxiliary ventilation system

BPJ2 / QJZ

Intelligent auxiliary ventilation system for mines

Automatic ventilation control. Safety. Energy efficiency.

BPJ2 frequency convertersQJZ intelligent starters660 / 1140 V versions
Twin auxiliary fans with a frequency converter and a starter

01 — Next-generation intelligent ventilation

Air where it is needed. In the volume that is needed.

The auxiliary ventilation system combines the fan, frequency converter, intelligent starter and mine atmosphere sensors into one controlled package. Fan output is set not by hand but by the actual air parameters in the heading.

The controller continuously reads the methane, airflow, air velocity and temperature sensors and changes the fan speed through the frequency converter. Power is backed up, and data goes to the dispatch monitoring system.

Airflow in a dead-end headingSimplified
Face Aux. fan Ventilation duct — fresh air Return air CH₄ Q, v, t°

Safety

Automatic ventilation control based on methane concentration and other mine atmosphere parameters.

Energy efficiency

Fan output is adjusted to the actual air demand.

Reliability

Automatic changeover between main and standby equipment.

Digital control

Remote monitoring and the option of centralised control.

02 — System architecture

One system for intelligent ventilation control

4 Main powersupply 660 / 1140 V, 50 Hz 4 Standby powersupply 660 / 1140 V, 50 Hz 3 Intelligentdual-powerswitch QJZ-2×160 / 2×200 5 Sensors CH₄, airflow,velocity,temperature 6 Controller Industrial PLC 2 Frequencyconverter BPJ2, 5–50 Hz 1 Fan auxiliaryventilation 7 Remote monitoring system RS485 / Ethernet Controlroom Power Control signals Data
  1. 1Auxiliary fan — delivers fresh air to the face through the duct.
  2. 2Frequency converter — changes the speed of the fan motor.
  3. 3Intelligent switch — switches between the two power feeds and changes over to standby.
  4. 4Main and standby supplies — two independent power lines.
  5. 5Mine atmosphere sensors — measure methane, airflow, air velocity and temperature.
  6. 6Industrial controller — processes the signals and issues control commands.
  7. 7Remote monitoring — reports equipment status to the control room.

03 — Automatic ventilation control

Intelligent control based on mine atmosphere parameters

The controller takes several parameters into account at once: methane concentration, airflow and air velocity, and air temperature. Fan output is set from all of these signals together, which keeps the required ventilation regime and reduces the risks of atmosphere parameters going out of range.

  1. 01Methane concentration changes
  2. 02Sensor signal received
  3. 03Controller processes the signal
  4. 04Fan speed changes
  5. 05Airflow is corrected
  • Automatic fan speed control
  • Methane concentration monitoring
  • Regulation by airflow and air velocity
  • Air temperature taken into account
  • Automatic changeover between main and standby equipment
  • Soft start of motors
  • Fault monitoring
  • Remote monitoring

Automatic speed control modes

Combined control — modes 3–5

  1. Mode 1 Methane Speed control by methane concentration
  2. Mode 2 Airflow Control by airflow
  3. Mode 3 Methane + airflow Main parameter: methane; additional: airflow
  4. Mode 4 Methane + airflow, velocity, t° Main parameter: methane; the others are additional
  5. Mode 5 Methane + velocity, t° Main parameter: methane; the others are additional

The system performs its built-in protective functions and helps reduce the risks of ventilation failures.

04 — QJZ intelligent starters

QJZ — intelligent control and power redundancy

QJZ intelligent dual-power starter

Main parameters

SeriesQJZ
Supply voltage660/1140 V
Rated current2×160 A / 2×200 A
Frequency50 Hz
DutyS1
Utilisation categoryAC-3

Functions

  • Programmable logic controller
  • Automatic power changeover
  • LED and display indication
  • Motor protection
  • Fault diagnostics

Model comparison

ModelVoltage, VRated current Ie, AP max at 1140 V, kWP max at 660 V, kWFrequency
QJZ-2×160/1140(660)SF1140/6602×16023713850 Hz
QJZ-2×200/1140(660)SF1140/6602×20029917350 Hz
QJZ drawing, front view QJZ drawing, side views
Outline drawing of the QJZ intelligent dual-power switch

05 — BPJ2 frequency converters

BPJ2 — precise control of fan output

Rated power, kW
110 / 160
Output frequency, Hz
5–50
Supply voltage, V
660 / 1140
Communication interfaces
RS485 · Ethernet
Coolingair, heat-pipe
Dutycontinuous

Features

  • SPWM frequency control
  • Automatic output control
  • Methane concentration monitoring
  • Remote monitoring
  • Motor protection functions
  • Support for centralised control
BPJ2 frequency converter

Product range

ModelPowerInput voltageInput currentCarrier frequencyDimensions, mmWeight
BPJ2-160/1140SF160 kWAC 1140 V104 A1.5 kHz2192×1121×13001680 kg
BPJ2-160/660SF160 kWAC 660 V175 A2.5 kHz2192×1121×13001680 kg
BPJ2-110/1140SF110 kWAC 1140 V73 A1.5 kHz1970×1300×10271500 kg
BPJ2-110/660SF110 kWAC 660 V120 A2.5 kHz1970×1300×10271500 kg

All models: output frequency 5–50 Hz, continuous duty, RS485 and Ethernet interfaces. BPJ2-160 is for a 150 kW fan or counter-rotating fans of 2×75 kW and below; BPJ2-110 is for a 110 kW fan or 2×55 kW and below.

06 — Reliability and industrial safety

A complete approach to mine ventilation safety

Control room Surface Aux. fan QJZ BPJ2 CH₄ 1 2 3 4 5
  1. 01 Methane control Fan output is regulated by sensor signals.
  2. 02 Redundancy Automatic changeover between main and standby equipment.
  3. 03 Motor protection Fault monitoring and protective functions of the control system.
  4. 04 Power interlocks Fan–power interlocks and methane-based power cut-off.
  5. 05 Dispatch monitoring Data is sent to the centralised monitoring system.

Intelligent ventilation — the basis of safe and efficient mine operation

  • Safety
  • Automation
  • Energy efficiency

07 — Technical advice

Get technical advice

Describe the heading and the equipment: fan type and power, supply voltage, the control modes you need and the atmosphere parameters to monitor — we will put together a package with a BPJ2 converter and a QJZ starter.